Cases

Cases

BEIKE NEW MATERIAL
NEW Fully enclosed steel framework project for the coal yard of the Calaca Power Plant in the Philippines

Fully enclosed steel framework project for the coal yard of the Calaca Power Plant in the Philippines

Total steel consumption: 13,000T Structure type: Dome reticulated shell Project overview: The Coaswagan 4x135MW thermal power plant project in Coaswagan town, Iligan City, Lanao del Norte province, Mindanao Island, Philippines, is 360 meters long, 110 meters wide, and 45 meters high. The project features a 40,000 square meter spatial reticulated shell structure, the largest single building in the power plant project, with a coal storage capacity of 200,000 tons. As an international project undertaken by our company on an EPC basis, it showcases our integrated operational advantages in design, manufacturing, supply, and construction and installation, earning unanimous praise from the foreign owner and the general contracting consortium.
NEW Pakistan Thar 2*330mw CFB Power Plant Project

Pakistan Thar 2*330mw CFB Power Plant Project

Total steel consumption: 13,000T Structure type: Steel frame structure Project overview: This project is the 2X330MW CFB coal-fired power plant project in Thar, Pakistan. This phase includes two 330MW units, including the steel structure of Boiler No. 1 and the main plant building structure No. 1. The thickest steel plate of the boiler steel structure reaches 150mm.
NEW Malaysia Tanjung Bin deepwater port jetty pipe rack project

Malaysia Tanjung Bin deepwater port jetty pipe rack project

Total steel consumption: 12,000T Project Overview: The project is part of the second phase of the Beigalan deep-water port offshore oil pipeline project. It adheres to American welding standards, comprising 430 modules divided into 10 batches. The project demands high installation precision. In the face of rough seas, 5-meter by 23-meter modules are installed in one go. It employs the world's most advanced seawater corrosion prevention measures, ensuring protection against marine chloride environments for 15 years. The Beigalan deep-water port project in Malaysia is one of the key projects in the Malaysian government's economic transformation plan and a crucial part of the Belt and Road Initiative. The construction and operation of the Beigalan deep-water port are of significant and far-reaching importance to the economic development and commercial cooperation between China and Malaysia. The project has also received positive feedback from the owner, who awarded us an honorary medal.
NEW Yamama Cement Plant Project, Saudi Arabia

Yamama Cement Plant Project, Saudi Arabia

Total steel consumption: 12,000T Structure type: Steel frame structure Project overview: The largest building (preheating tower) is 36.5m long × 21.9m wide × 164m high, with a single steel structure weighing 4381T. The drawings, nodes and detailed design are directly connected to Thyssenkrupp, strictly implementing American standard manufacturing standards. In the field of industrial equipment steel structures, its building height and single steel structure weight are rare.
NEW Malabo International Airport Terminal Project, Equatorial Guinea

Malabo International Airport Terminal Project, Equatorial Guinea

The new terminal building at Guinea Malabo Airport consists of a waiting hall, a connecting building, and a finger pier. The hall is approximately 150 meters long and 60 meters wide, with a column grid of 10*10 meters. The finger pier is approximately 290 meters long and 27 meters wide, with a column grid of 10*9 meters. The connecting building in the middle is approximately 80 meters long and 20 meters wide, with a column grid of 10*10 meters. This project uses 2500 tons of steel, 23,000 square meters of roof cladding, and wall cladding.
NEW Kazan Alkali Mine Project, Turkey

Kazan Alkali Mine Project, Turkey

Total steel consumption: 14800T Structure type: Steel frame structure Project overview: Kazan alkali mine project in Turkey, located in Beypazari town, Ankara province, Turkey. The project includes a lattice column workshop and a steel frame gallery, with a total steel consumption of over 14,000 tons. The main sections include caustication section, decahydrate alkali section, water alkali crystallization section, steam stripping evaporation section, and sodium bicarbonate building, etc. In the context of China's Belt and Road Initiative, Turkey, as an important node spanning Eurasia, has a significant geographical location. This project will promote the establishment of Zhongtong brand steel structures in Turkey, actively promote the application of Chinese technology to other countries, and accelerate the research and development of practical new technologies.
NEW Tatopani-Bode Koshi River Bridge, Nepal

Tatopani-Bode Koshi River Bridge, Nepal

The main beam of this bridge adopts a 90-meter simply supported, equal-height steel truss beam with a full-width arrangement. Two truss girders are arranged in the transverse direction of the bridge, with a center-to-center distance of 10.5m and a girder height of 8.5m. The intervals are 6.25m and 8.5m respectively, with a total of 11 intervals across the entire bridge. The steel truss beam consists of upper chord members, lower chord members, web members, longitudinal and transverse beams, upper longitudinal connecting plates, and bridge portal frames. The steel consumption is approximately 870 tons. The project uses the integral traction sliding construction method.
NEW JIMA Industrial Park Project, Ethiopia

JIMA Industrial Park Project, Ethiopia

The JIMA Industrial Park in Ethiopia is located in Jimma, the capital city of Oromia, Ethiopia. It is the first modern industrial park in Oromia. The planned area of the park is 75 hectares. Upon full operation, the industrial park will create 12,000 jobs and generate $200 million in annual export revenue, significantly boosting local economic development. [Company Name] was responsible for the fabrication, transportation, and installation of a 25,000 square meter steel structure factory building.
< 1 >