Cases
Contact Us
Tel:86-635-2126667
E-Mail:LCBKKJBGS@163.com
Add: No. 63, Huitong Road, Dongchangfu District, Liaocheng City, Shandong Province
Lanzhou Donggang Interchange Project
General Contractor: China Railway 21st Bureau Group Fifth Engineering Construction Co., Ltd.
Design Institute: Shanghai Urban Construction Design & Research Institute (Group) Co., Ltd.
Project Overview: This project is the demolition and reconstruction of the Donggang Overpass in Lanzhou City. The main bridge is a continuous steel box girder with spans of 23m+42m+35m+30m, a standard deck width of 25.5m, a girder height of 1.8m, and a total weight of 1050 tons. The construction method is the overall top-push sliding method, with a total jacking length of 51 meters.
Longhai Road Elevated Road Project
Project Location: Zhengzhou, Henan Province
Project Overview: Approximately 21.5KM in total length. The elevated bridge starts from the west of the West Third Ring Road, then shifts south after reaching Weilai Road, continues eastward along Huozhan Street, and finally intersects with the Beijing-Hong Kong-Macau Expressway. The height of the steel box girder of the No. 3 section ramp is 2-2.2 meters, with a bridge width of 9-11 meters, and a single-box double-cell section. The height of the No. 43 section rigid box girder of the main line in section No. 5 is 2 meters, with a bridge width of 35-40.1 meters. The total project volume is 4300 tons.
Bai Lang River Bridge and Ferris Wheel Project, Weifang Binhai Economic Development Zone
Project Location: Weifang, Shandong Province
Project Overview: The Bailang River Bridge is 540 meters long, with a main bridge of 190 meters and approach bridges of 350 meters. A 125-meter diameter Ferris wheel is located at the center of the bridge, creating a unique style of bridge and wheel combined. This Ferris wheel is the world's largest hubless Ferris wheel using a woven mesh design, and upon completion will become a distinctive landmark of Weifang City. The project volume is 2456 tons.
Zhao Wang River Park, Heze City, Shandong Province: Great Wall Road Bridge Project
Project Location: Heze, Shandong Province
Project Overview: This project is a cable-stayed bridge with a total of 12 bridge towers, 8 Type A and 4 Type B. Each tower consists of three parts: the base, the body, and the crown. Each tower body is 13.788m long and weighs up to 17.6t. After assembly, the overall height is 18.5m and the total weight is approximately 83t.
Shijiazhuang Northern Area Infrastructure Renovation Steel Box Girder Project
Project Location: Shijiazhuang, Hebei Province
Project Overview: Phase V of the Northern Shijiazhuang Infrastructure Improvement and Transformation Project involves the fabrication of steel box girder ramps at a factory. The project includes four areas of steel box girder ramp bridges, with a total construction volume of 24,300 tons.