Cases

Cases

BEIKE NEW MATERIAL
NEW Relocation of the old plant and isocyanate integration project of Yantai Wanhua Polyurethane Co., Ltd.

Relocation of the old plant and isocyanate integration project of Yantai Wanhua Polyurethane Co., Ltd.

Structural Form: Primarily steel frame structure Project Location: Yantai, Shandong Province Construction Unit: Wanhua Chemical Group Co., Ltd. Design Unit: Hualu Engineering Technology Co., Ltd. Project Overview: The total steel volume of this project is 24,200 tons, consisting of multiple project unit structures. It mainly includes steel frame structures for methanol synthesis units, ammonia refrigeration units, raw material storage and preparation units, methanol rectification, wastewater systems, low-temperature methanol washing, main methanol units, nitric acid units, formaldehyde tank areas, and auxiliary walkways.
NEW Lanzhou Donggang Interchange Project

Lanzhou Donggang Interchange Project

General Contractor: China Railway 21st Bureau Group Fifth Engineering Construction Co., Ltd. Design Institute: Shanghai Urban Construction Design & Research Institute (Group) Co., Ltd. Project Overview: This project is the demolition and reconstruction of the Donggang Overpass in Lanzhou City. The main bridge is a continuous steel box girder with spans of 23m+42m+35m+30m, a standard deck width of 25.5m, a girder height of 1.8m, and a total weight of 1050 tons. The construction method is the overall top-push sliding method, with a total jacking length of 51 meters.
NEW Longhai Road Elevated Road Project

Longhai Road Elevated Road Project

Project Location: Zhengzhou, Henan Province Project Overview: Approximately 21.5KM in total length. The elevated bridge starts from the west of the West Third Ring Road, then shifts south after reaching Weilai Road, continues eastward along Huozhan Street, and finally intersects with the Beijing-Hong Kong-Macau Expressway. The height of the steel box girder of the No. 3 section ramp is 2-2.2 meters, with a bridge width of 9-11 meters, and a single-box double-cell section. The height of the No. 43 section rigid box girder of the main line in section No. 5 is 2 meters, with a bridge width of 35-40.1 meters. The total project volume is 4300 tons.
NEW Hanyu Financial Business Center A5-3# Building and ancillary facilities project

Hanyu Financial Business Center A5-3# Building and ancillary facilities project

Owner: Jinan High-tech Holding Group Co., Ltd. General Contractor: China Construction Eighth Engineering Bureau Co., Ltd. Structural Form: Steel pipe concrete frame - reinforced concrete core tube structure, with a total steel consumption of 20,000 tons. Project Address: East of Shunhua Road, West of Fenghuang Road, South of Jing Shi Dong Road, and North of the extension of Tiyu Nan Road, High-tech Zone, Jinan. Design Institute: Shandong Provincial Architectural Design Research Institute, ZTSS detailed design
NEW Gansu Provincial Power Company Dispatch Communication Building Project

Gansu Provincial Power Company Dispatch Communication Building Project

Client/General Contractor: Gansu Provincial Power Company/Beijing Construction Engineering Group Structural Form: Steel-concrete composite tubular structure, the main building is a steel-concrete composite tubular structure, the annex building is a reinforced concrete shear wall, with a total steel consumption of 15,000 tons. Project Address: Plot G0906, Yanchangbao, Chengguan District, Lanzhou City (west of Yantan Bridge, north of Beibinhe Road); Design Institute: Zhejiang University Architectural Design Institute, ZTSS detailed design Supervisory Unit: Shanghai Jianke Construction Supervision and Consulting Co., Ltd.;
NEW National Heavy Duty Vehicle Technology Research and Development Center

National Heavy Duty Vehicle Technology Research and Development Center

Structural Form: Steel-concrete structure, total project volume approximately 1200 tons. Project Address: Shunhua South Road, High-tech Zone, Jinan City. Design Institute: China Construction International (Shenzhen) Design Consultant Co., Ltd. Supervision Unit: Shanghai Jianke Construction Supervision and Consulting Co., Ltd. Project Overview: The research building has 36 floors above ground and 4 floors underground; the automobile exhibition hall has 5 floors above ground, with a total construction area of 118279.62 square meters. The steel columns are "cross-shaped columns", some steel beams are used in the floors, and there are steel cantilever platforms on the third and fourth floors of the exhibition hall.
NEW Tianjin Henglong Plaza Project

Tianjin Henglong Plaza Project

Structural Form: Steel-concrete composite structure, 12,000 tons of steel used. Project Address: Located in Tianjin, facing the Haihe River, south of Heping Road, north of Xing'an Road, east of Binjiang Road, and west of Hami Road. Architectural Design: BMA International Structural Design: Arup Supervisory Unit: Jianhua Engineering Consulting Management Company Project Overview: Covering an area of 40,000 square meters, with a total construction area of 260,000 square meters. The plaza structure is designed as a seven-story above-ground, one-story underground commercial, entertainment, and leisure area, and a two-story and three-story underground parking garage complex. The entire project has a single-body design length of 370 meters and a building height of 50 meters. Upon completion, it will be one of the longest shopping malls in China.
NEW Jinjiang Henglong Plaza Project

Jinjiang Henglong Plaza Project

Structural Form: Steel-concrete composite structure and steel structure, using 12,000 tons of steel. Project Address: North of Quancheng Square, Jinan City Architect: (HONGKONG) Palmer & Turner International Structural Design: Maosheng Structural Consulting Co., Ltd., ZTSS detailed design Supervisory Unit: Shandong Provincial Engineering Construction Supervision Company Project Overview: An integrated building with shopping malls, restaurants, cinemas, and parking. Total construction area: 277,000 m². Layout: 2 underground floors, 8 above-ground floors for the mall, and 2 above-ground floors for an auxiliary building. Building height: 50m.
NEW Jinan. The 11th National Games Cycling Venue Project

Jinan. The 11th National Games Cycling Venue Project

Structural Form: Spatial tube truss structure Project Address: High-tech Zone, Jinan, Shandong Province Design Institute: Shandong Jianzhu University Design Institute, ZTSS detailed design Supervisory Unit: Beijing Parker Construction Supervision and Consulting Co., Ltd. Project Overview: The project is an eccentric ellipse, shaped like a cyclist's helmet. The project covers an area of 22,000㎡, with a construction area of 16,000㎡, a total steel consumption of 3,500 tons, a major axis of approximately 134.6m, a minor axis of approximately 101m, and a maximum elevation of approximately 36.1m. The structure consists of 32 radial trusses and 5 circumferential trusses.
NEW Jinhua-Shanghai High-Speed Railway Dezhou Integrated Passenger Station Phase I Project

Jinhua-Shanghai High-Speed Railway Dezhou Integrated Passenger Station Phase I Project

Structural Form: Spatial pipe truss structure, total steel consumption 11,000 tons Project Location: South of Dezhou Railway Station Square, Dezhou Economic Development Zone, Dezhou City Design Institute: Beijing Qingshang Huanyi Architectural Design Institute Co., Ltd. Project Overview: This project is a first-class passenger station determined by the national highway transportation hub overall planning. It has high design standards and a large construction scale, covering an area of 200,000 square meters with a total construction area of 126,000 square meters.
NEW Datong Airport Expansion Project, Terminal Area Package 1

Datong Airport Expansion Project, Terminal Area Package 1

Structural Form: Space Truss Project Address: Beijia Town, Datong County, Datong City Design Institute: China Architecture Design & Research Group Co., Ltd., Fan Chong Structure Room Supervisory Unit: Beijing Zhongqi Jianfa Supervision and Consulting Co., Ltd. Project Overview: The project has a total construction area of approximately 10835 square meters and a total height of 37.55 meters; it consists of gantry trusses and A-frame trusses, and also includes diamond columns, embedded parts, cast steel nodes, hanging platforms, and purlin supports; the gantry truss has a single span of 120 meters.
< 123 >