Pakistan Thar 2*330mw CFB Power Plant Project
Total steel consumption: 13,000T Structure type: Steel frame structure Project overview: This project is the 2X330MW CFB coal-fired power plant project in Thar, Pakistan. This phase includes two 330MW units, including the steel structure of Boiler No. 1 and the main plant building structure No. 1. The thickest steel plate of the boiler steel structure reaches 150mm.
Total steel consumption: 13,000T
Structure type: Steel frame structure
Project Overview: This project is the 2X330MW CFB coal-fired power plant project in Thar, Pakistan. This phase includes two 330MW units, including the No. 1 boiler steel structure and the No. 1 main plant structure. The thickest steel plate of the boiler steel structure reaches 150mm.