BEIKE NEW MATERIAL

Yamama Cement Plant Project, Saudi Arabia

Total steel consumption: 12,000T Structure type: Steel frame structure Project overview: The largest building (preheating tower) is 36.5m long × 21.9m wide × 164m high, with a single steel structure weighing 4381T. The drawings, nodes and detailed design are directly connected to Thyssenkrupp, strictly implementing American standard manufacturing standards. In the field of industrial equipment steel structures, its building height and single steel structure weight are rare.


总用钢量:1.2万T

结构类型:钢框架结构

项目概况:最大建筑物(预热塔)长36.5m×宽21.9m×高164m,单体钢结构重量4381T。

图纸节点及深化设计直接对接蒂森克虏伯(Thyssenkrupp),严格执行美标制作标准,在工业装置钢结构领域,其建筑物高度、单体钢结构重量实属罕见。

undefined

NEW Relocation of the old plant and isocyanate integration project of Yantai Wanhua Polyurethane Co., Ltd.

Relocation of the old plant and isocyanate integration project of Yantai Wanhua Polyurethane Co., Ltd.

Structural Form: Primarily steel frame structure Project Location: Yantai, Shandong Province Construction Unit: Wanhua Chemical Group Co., Ltd. Design Unit: Hualu Engineering Technology Co., Ltd. Project Overview: The total steel volume of this project is 24,200 tons, consisting of multiple project unit structures. It mainly includes steel frame structures for methanol synthesis units, ammonia refrigeration units, raw material storage and preparation units, methanol rectification, wastewater systems, low-temperature methanol washing, main methanol units, nitric acid units, formaldehyde tank areas, and auxiliary walkways.
NEW Lanzhou Donggang Interchange Project

Lanzhou Donggang Interchange Project

General Contractor: China Railway 21st Bureau Group Fifth Engineering Construction Co., Ltd. Design Institute: Shanghai Urban Construction Design & Research Institute (Group) Co., Ltd. Project Overview: This project is the demolition and reconstruction of the Donggang Overpass in Lanzhou City. The main bridge is a continuous steel box girder with spans of 23m+42m+35m+30m, a standard deck width of 25.5m, a girder height of 1.8m, and a total weight of 1050 tons. The construction method is the overall top-push sliding method, with a total jacking length of 51 meters.
NEW Longhai Road Elevated Road Project

Longhai Road Elevated Road Project

Project Location: Zhengzhou, Henan Province Project Overview: Approximately 21.5KM in total length. The elevated bridge starts from the west of the West Third Ring Road, then shifts south after reaching Weilai Road, continues eastward along Huozhan Street, and finally intersects with the Beijing-Hong Kong-Macau Expressway. The height of the steel box girder of the No. 3 section ramp is 2-2.2 meters, with a bridge width of 9-11 meters, and a single-box double-cell section. The height of the No. 43 section rigid box girder of the main line in section No. 5 is 2 meters, with a bridge width of 35-40.1 meters. The total project volume is 4300 tons.