NEW Relocation of the old plant and isocyanate integration project of Yantai Wanhua Polyurethane Co., Ltd.

Relocation of the old plant and isocyanate integration project of Yantai Wanhua Polyurethane Co., Ltd.

Structural Form: Primarily steel frame structure Project Location: Yantai, Shandong Province Construction Unit: Wanhua Chemical Group Co., Ltd. Design Unit: Hualu Engineering Technology Co., Ltd. Project Overview: The total steel volume of this project is 24,200 tons, consisting of multiple project unit structures. It mainly includes steel frame structures for methanol synthesis units, ammonia refrigeration units, raw material storage and preparation units, methanol rectification, wastewater systems, low-temperature methanol washing, main methanol units, nitric acid units, formaldehyde tank areas, and auxiliary walkways.
NEW Shanxi Lu'an Mining High-sulfur Coal Clean Utilization Oil-electricity-heat Integration Demonstration Project

Shanxi Lu'an Mining High-sulfur Coal Clean Utilization Oil-electricity-heat Integration Demonstration Project

Structural Form: Gasification steel frame structure + coal milling frame structure Project Location: Xiangyuan, Shanxi Design Institute: Wison Engineering (China) Co., Ltd. Project Overview: This project supplies 24,000 tons, including gasification frame: above elevation 42.000 is steel frame structure, length x width = 55m x 24m, roof elevation is 129m; coal milling frame: above elevation 56.000 is steel frame structure, length x width = 46m x 26m, roof elevations are 27m, 56m, and 100.4m.
NEW Shenhua Baotou Coal Chemical Co., Ltd. Coal-to-Olefins Gasification Unit Steel Structure

Shenhua Baotou Coal Chemical Co., Ltd. Coal-to-Olefins Gasification Unit Steel Structure

Structural Form: Steel frame structure Project Address: Baotou City, Inner Mongolia Autonomous Region Design Institute: TCC Project Overview: This project is a steel frame structure with a total steel consumption of 8000 tons. The main steel materials used in this project are national standard steel and welded H-section steel, and the anti-corrosion treatment mainly uses galvanized protective coating. The project mainly consists of a coal mill building, steel coal silo, coal slurry preparation area 2, coal slurry preparation area 3, coal slurry feeding, gasification framework, slag water treatment, and gasification device gallery. Partial exterior walls are made of color-coated steel plates. The total building height is 78 meters, with varying numbers of floors, and the floors use steel grating.