Cases

Cases

BEIKE NEW MATERIAL

Kazan Alkali Mine Project, Turkey

Total steel consumption: 14800T Structure type: Steel frame structure Project overview: Kazan alkali mine project in Turkey, located in Beypazari town, Ankara province, Turkey. The project includes a lattice column workshop and a steel frame gallery, with a total steel consumption of over 14,000 tons. The main sections include caustication section, decahydrate alkali section, water alkali crystallization section, steam stripping evaporation section, and sodium bicarbonate building, etc. In the context of China's Belt and Road Initiative, Turkey, as an important node spanning Eurasia, has a significant geographical location. This project will promote the establishment of Zhongtong brand steel structures in Turkey, actively promote the application of Chinese technology to other countries, and accelerate the research and development of practical new technologies.


Total steel consumption: 14800T

Structure type: Steel frame structure

Project Overview: The Kazan alkali mine project in Turkey is located in Beypazari town, Ankara province, Turkey. It includes a lattice column workshop and a steel frame gallery, with a total steel consumption of over 14,000 tons. The main sections include caustication, decahydrate alkali, water alkali crystallization, stripping evaporation, and small soda building sections. In the context of the national "One Belt, One Road" strategy, Turkey, as an important node spanning Eurasia, has a significant geographical location. This project will promote Zhongtong brand steel structures in Turkey and actively promote the application of Chinese technology to other countries, accelerating the research and development of practical new technologies.

undefined

NEW Relocation of the old plant and isocyanate integration project of Yantai Wanhua Polyurethane Co., Ltd.

Relocation of the old plant and isocyanate integration project of Yantai Wanhua Polyurethane Co., Ltd.

Structural Form: Primarily steel frame structure Project Location: Yantai, Shandong Province Construction Unit: Wanhua Chemical Group Co., Ltd. Design Unit: Hualu Engineering Technology Co., Ltd. Project Overview: The total steel volume of this project is 24,200 tons, consisting of multiple project unit structures. It mainly includes steel frame structures for methanol synthesis units, ammonia refrigeration units, raw material storage and preparation units, methanol rectification, wastewater systems, low-temperature methanol washing, main methanol units, nitric acid units, formaldehyde tank areas, and auxiliary walkways.
NEW Lanzhou Donggang Interchange Project

Lanzhou Donggang Interchange Project

General Contractor: China Railway 21st Bureau Group Fifth Engineering Construction Co., Ltd. Design Institute: Shanghai Urban Construction Design & Research Institute (Group) Co., Ltd. Project Overview: This project is the demolition and reconstruction of the Donggang Overpass in Lanzhou City. The main bridge is a continuous steel box girder with spans of 23m+42m+35m+30m, a standard deck width of 25.5m, a girder height of 1.8m, and a total weight of 1050 tons. The construction method is the overall top-push sliding method, with a total jacking length of 51 meters.
NEW Longhai Road Elevated Road Project

Longhai Road Elevated Road Project

Project Location: Zhengzhou, Henan Province Project Overview: Approximately 21.5KM in total length. The elevated bridge starts from the west of the West Third Ring Road, then shifts south after reaching Weilai Road, continues eastward along Huozhan Street, and finally intersects with the Beijing-Hong Kong-Macau Expressway. The height of the steel box girder of the No. 3 section ramp is 2-2.2 meters, with a bridge width of 9-11 meters, and a single-box double-cell section. The height of the No. 43 section rigid box girder of the main line in section No. 5 is 2 meters, with a bridge width of 35-40.1 meters. The total project volume is 4300 tons.