BEIKE NEW MATERIAL

Smart vertical high-bay warehouse project of Chalco Ruimin Aluminum Plate and Strip Co., Ltd.

Structural Form: Steel frame structure coil rack, steel consumption 2600 tons. Project Address: Mawei District, Fuzhou City, Fujian Province Construction Unit: Chalco Ruimin Aluminum Plate and Strip Co., Ltd. Project Overview: The intelligent warehouse is 196m long, 18m wide, and 26m high in total. The bottom of the beam is 24.55m high. There are 5 layers of coil storage, 3 rows of coil racks, and two full-length central aisles, with a total of approximately 699 coil positions and a maximum coil weight of 18.2 tons.


Structure: Steel frame structure coil rack, steel consumption 2600 tons.

Project Address: Mawei District, Fuzhou City, Fujian Province

Construction Unit: Chalco Ruimin Aluminum Plate and Strip Co., Ltd.

Project Overview: The intelligent warehouse is 196m long, 18m wide, with a total height of 26m, a beam bottom height of 24.55m, 5 storage layers, 3 rows of coil racks, two full-length central aisles, approximately 699 coil positions, and a maximum coil weight of 18.2 tons.

undefined

NEW Relocation of the old plant and isocyanate integration project of Yantai Wanhua Polyurethane Co., Ltd.

Relocation of the old plant and isocyanate integration project of Yantai Wanhua Polyurethane Co., Ltd.

Structural Form: Primarily steel frame structure Project Location: Yantai, Shandong Province Construction Unit: Wanhua Chemical Group Co., Ltd. Design Unit: Hualu Engineering Technology Co., Ltd. Project Overview: The total steel volume of this project is 24,200 tons, consisting of multiple project unit structures. It mainly includes steel frame structures for methanol synthesis units, ammonia refrigeration units, raw material storage and preparation units, methanol rectification, wastewater systems, low-temperature methanol washing, main methanol units, nitric acid units, formaldehyde tank areas, and auxiliary walkways.
NEW Lanzhou Donggang Interchange Project

Lanzhou Donggang Interchange Project

General Contractor: China Railway 21st Bureau Group Fifth Engineering Construction Co., Ltd. Design Institute: Shanghai Urban Construction Design & Research Institute (Group) Co., Ltd. Project Overview: This project is the demolition and reconstruction of the Donggang Overpass in Lanzhou City. The main bridge is a continuous steel box girder with spans of 23m+42m+35m+30m, a standard deck width of 25.5m, a girder height of 1.8m, and a total weight of 1050 tons. The construction method is the overall top-push sliding method, with a total jacking length of 51 meters.
NEW Longhai Road Elevated Road Project

Longhai Road Elevated Road Project

Project Location: Zhengzhou, Henan Province Project Overview: Approximately 21.5KM in total length. The elevated bridge starts from the west of the West Third Ring Road, then shifts south after reaching Weilai Road, continues eastward along Huozhan Street, and finally intersects with the Beijing-Hong Kong-Macau Expressway. The height of the steel box girder of the No. 3 section ramp is 2-2.2 meters, with a bridge width of 9-11 meters, and a single-box double-cell section. The height of the No. 43 section rigid box girder of the main line in section No. 5 is 2 meters, with a bridge width of 35-40.1 meters. The total project volume is 4300 tons.