BEIKE NEW MATERIAL

National Heavy Duty Vehicle Technology Research and Development Center

Structural Form: Steel-concrete structure, total project volume approximately 1200 tons. Project Address: Shunhua South Road, High-tech Zone, Jinan City. Design Institute: China Construction International (Shenzhen) Design Consultant Co., Ltd. Supervision Unit: Shanghai Jianke Construction Supervision and Consulting Co., Ltd. Project Overview: The research building has 36 floors above ground and 4 floors underground; the automobile exhibition hall has 5 floors above ground, with a total construction area of 118279.62 square meters. The steel columns are "cross-shaped columns", some steel beams are used in the floors, and there are steel cantilever platforms on the third and fourth floors of the exhibition hall.


Structural Form: Steel-concrete structure, with a total project volume of approximately 1200 tons

Project Address: Shunhua South Road, High-tech Zone, Jinan City

Design Institute: China Construction International (Shenzhen) Design Consultant Co., Ltd.

Supervision Unit: Shanghai Jianke Construction Supervision and Consulting Co., Ltd.

Project Overview: The research building has 36 floors above ground and 4 floors underground; the automobile exhibition hall has 5 floors above ground, with a total construction area of 118279.62 square meters. The steel columns are "cross-shaped", some steel beams are used in the floors, and there are steel cantilever platforms on the third and fourth floors of the exhibition hall.

undefined

NEW Relocation of the old plant and isocyanate integration project of Yantai Wanhua Polyurethane Co., Ltd.

Relocation of the old plant and isocyanate integration project of Yantai Wanhua Polyurethane Co., Ltd.

Structural Form: Primarily steel frame structure Project Location: Yantai, Shandong Province Construction Unit: Wanhua Chemical Group Co., Ltd. Design Unit: Hualu Engineering Technology Co., Ltd. Project Overview: The total steel volume of this project is 24,200 tons, consisting of multiple project unit structures. It mainly includes steel frame structures for methanol synthesis units, ammonia refrigeration units, raw material storage and preparation units, methanol rectification, wastewater systems, low-temperature methanol washing, main methanol units, nitric acid units, formaldehyde tank areas, and auxiliary walkways.
NEW Lanzhou Donggang Interchange Project

Lanzhou Donggang Interchange Project

General Contractor: China Railway 21st Bureau Group Fifth Engineering Construction Co., Ltd. Design Institute: Shanghai Urban Construction Design & Research Institute (Group) Co., Ltd. Project Overview: This project is the demolition and reconstruction of the Donggang Overpass in Lanzhou City. The main bridge is a continuous steel box girder with spans of 23m+42m+35m+30m, a standard deck width of 25.5m, a girder height of 1.8m, and a total weight of 1050 tons. The construction method is the overall top-push sliding method, with a total jacking length of 51 meters.
NEW Longhai Road Elevated Road Project

Longhai Road Elevated Road Project

Project Location: Zhengzhou, Henan Province Project Overview: Approximately 21.5KM in total length. The elevated bridge starts from the west of the West Third Ring Road, then shifts south after reaching Weilai Road, continues eastward along Huozhan Street, and finally intersects with the Beijing-Hong Kong-Macau Expressway. The height of the steel box girder of the No. 3 section ramp is 2-2.2 meters, with a bridge width of 9-11 meters, and a single-box double-cell section. The height of the No. 43 section rigid box girder of the main line in section No. 5 is 2 meters, with a bridge width of 35-40.1 meters. The total project volume is 4300 tons.